As Featured In

"The output delta before and after a SolarRestore service run reads like a capital expenditure, not a maintenance line."

— Facility Executive Magazine, Q3 2025

Client Evidence

The logos aren't decoration. They're evidence.

NextEra Energy
Brookfield Renewable
Maricopa Co.
SunPower
0MW

restored to peak output

Maricopa County Utility Array, AZ — Q4 2025
Prologis
EQT Exeter
Duke Realty
Link Logistics
0%

average output recovery across 47 rooftop arrays

Prologis Inland Empire Portfolio, CA — 2025
Scottsdale
SRP
APS Solar
Imperial Valley
0M

in recovered annual revenue across municipal accounts

Southwest Municipal Portfolio — FY2025
Who We Service

Built for the people watching yield reports.

Three distinct service tracks. One standard: factory-spec transmittance on delivery.

MW-Scale Arrays

Utility Scale

Farms losing yield quarter over quarter

Your SCADA dashboard shows a 2–4% quarterly decline that isn't weather. Hard-water mineral deposits and pollen accumulation are compounding. A single SolarRestore service run on a 5 MW array typically recovers 140–200 MWh annually.

27.3%

Avg. output recovery

Quarterly

Service cycle

Warehouse Portfolios

Commercial Property

Rooftop arrays on warehouse portfolios

REIT managers and operations directors need proof for the next board deck. We service multi-site portfolios under a single MSA with per-site yield reports, before/after transmittance readings, and insurance-compliant documentation.

Up to 200

Sites under single MSA

48 hrs

Report turnaround

HOA Contracts

HOA & Residential

Community installs kept compliant

HOA-contracted facility teams face compliance requirements and resident expectations simultaneously. We maintain manufacturer warranty compliance, deliver per-unit performance certificates, and coordinate with your existing landscape schedule.

100%

Warranty compliance

72 hrs

Scheduling window

The Method

Factory spec isn't a marketing claim. It's a measurement.

Four-phase process. Every engagement closes with a signed transmittance certificate.

01
Assessment

Pre-service thermal imaging & soiling index

Before a single drop of water, our technicians run a drone-mounted thermal sweep and calculate a soiling ratio using calibrated pyranometers. You receive a baseline transmittance report — the number your CFO will compare to the post-service reading.

Baseline in 90 min
02
Deionization

Zero-TDS water, no detergent, no residue

Our mobile DI rigs deliver water at <1 ppm total dissolved solids. No soap means no surfactant film, no mineral redeposition on the next rain cycle.

<1 ppm TDS
03
Robotics

Soft-bristle automated traversal at 0.8 m/s

Counter-rotating soft nylon brushes track the panel surface at a calibrated pressure — below the 5 N/cm² threshold that voids most manufacturer warranties. No foot traffic on arrays.

0 warranty voids
04
Certification

Post-service transmittance report, 48 hrs

Every service closes with a digitally signed transmittance certificate, before/after irradiance-corrected output comparison, and a projected annual revenue recovery figure at your local LCOE.

Board-ready PDF

2.3 GW

Total capacity serviced

340+

Commercial sites

99.2%

Warranty compliance rate

48 hr

Report turnaround

The Next Step

The output you're missing is already paid for.

Enter your array size, last cleaning date, and zip code. We'll return a projected annual revenue recovery figure — before you commit to anything.

No commitment. Board-ready report delivered in 48 hours.